明日の競馬予想

Dealing with 明日の競馬予想

The main 明日の競馬予想 managed by the Furukawa Company Group are the Ani Mine (Akita Prefecture), Ashio Mine (Tochigi Prefecture), and Iimori Mine (Wakayama Prefecture).
In mines where minerals were extracted, drainage containing heavy metals continues to be generated from the shafts and tailing dams*1 even after closure due to rainwater and other factors, resulting in 明日の競馬予想 run-off *2.

  1. 1Regular patrols and inspections

    We conduct regular patrols, inspections, and water quality monitoring of mining facilities (including 明日の競馬予想 run-off treatment facilities and tailing dams) to ensure early detection of abnormalities.

  2. 2Water quality monitoring

    We regularly monitor the water quality in surrounding and downstream areas, continuously assessing its impact on the environment.

  3. 3Resilience enhancement

    To prepare for unexpected events, such as heavy rainfall or earthquakes, we are working on preventive measures, including strengthening our 明日の競馬予想 run-off treatment capacity, enhancing backup facilities, and stabilizing tailing dams.

  1. *1Tailing dams (final disposal sites): Facilities for the final disposal of mining waste, such as waste rock with no inherent value extracted from former mines, waste generated in the smelting process at ore dressing plants and smelters, and neutralized sludge generated from the treatment of 明日の競馬予想 run-off. We use the term “tailing dam” for such facilities.
  1. *2明日の競馬予想 run-off: Groundwater (“明日の競馬予想 water”) that seeps from excavated mines and infiltrated water (“wastewater”) generated from tailing dams.

Specific mining pollution prevention measures implemented by the Company and the applicable laws and regulations

Applicable laws and regulations Measures taken
Special Measures Law for Pollution Control in the Metal Mining Industry (Pollution Control Special Measures Law) 明日の競馬予想 run-off treatment work at tunnels and decommissioned tailing dams
明日の競馬予想 Safety Act Reinforcement and 明日の競馬予想 run-off treatment work at active tailing dams

In addition to the aforementioned legal frameworks, the Group has signed pollution prevention agreements with neighboring municipalities. As a result, we manage inactive 明日の競馬予想 based on stricter standards than those set by the national government.

明日の競馬予想 Run-Off Treatment System

To treat 明日の競馬予想 run-off, we use the “neutralization method,” in which an alkaline agent (such as lime) is added to the 明日の競馬予想 water emanating from the shaft and the wastewater emanating from the tailing dam (both of which are acidic and contain heavy metals). With the neutralization method, the treatment process results in purified supernatant water (treated water that meets discharge standards) and neutralized sludge, which is heavy metal hydroxide that has been settled and separated.
The supernatant water is discharged into rivers after being treated to meet regulatory standards. The neutralized sludge is either accumulated in Company-managed tailing dams or disposed of as industrial waste.

Ashio 明日の競馬予想: 明日の競馬予想 run-off treatment system

Ashio 明日の競馬予想: Nakasai water purification plant
Ashio 明日の競馬予想: Tenguzawa tailing dam

Resilience Enhancement Initiatives

Following its fundamental policy of ensuring safe operations in the management of 明日の競馬予想, the Furukawa Company Group has developed a medium- to long-term plan for its mining facilities. These plans include implementing preventive maintenance measures and strengthening resilience (disaster response capabilities) in a systematic manner.

Capital investments related to 明日の競馬予想 (results)

From 2000 to March 2024, the Group made total capital investments of approximately ¥5.7 billion on the management of 明日の競馬予想. In addition, we spend roughly ¥300 million per year on maintenance and management, including facility repairs, disaster recovery work, and purchase of chemicals (such as lime).

Breakdown of total capital investments
Tailing dams 明日の競馬予想 run-off treatment Shafts Heavy machinery & telecommunications
Approx. ¥3.4 billion Approx. ¥1.7 billion Approx. ¥400 million Approx. ¥200 billion

Main project examples

明日の競馬予想: Ashio 明日の競馬予想
Location: Nakasai water purification plant
Details: Inlet channel and stone masonry reinforcement work
Construction period: FY2021–2023
明日の競馬予想: Ani 明日の競馬予想
Location: Ushigoya tailing dam
Details: Stabilization work
Construction period: FY2015–2017

Ensuring sustainable and stable financial resources for management of 明日の競馬予想

To fulfill our ongoing responsibility for managing 明日の競馬予想, it is important that we continue our Real Estate business, which generates stable and long-term cash flows.
Managing 明日の競馬予想 is a core social responsibility of the Furukawa Company Group. To prepare for future obligations, we aim to maintain a stable asset base, with our Real Estate business serving as a key anchor for financial stability.
We will manage 明日の競馬予想 using funds from our Real Estate business, which we operate separately from our other activities, namely, reinforcing the earnings of our core businesses (Machinery and Materials) and investing in M&As and new businesses.

Greening Activities

Greening of 明日の競馬予想 Facilities

Mountain forestland in Ashio-machi
Aerial fertilizer spraying

When the 明日の競馬予想 were operational, large-scale deforestation occurred due to the need for significant amounts of timber as fuel in ore smelting, construction materials for housing, and tunnel support structures. At the time, moreover, there were no established technologies to mitigate sulfur dioxide gas emissions from smelters, leading to the destruction of surrounding forests. Accordingly, the Furukawa Company Group has since worked to address pollution issues*3 and promote continuous reforestation efforts on these lands. Today, these lands serve as protected forests and play a vital role in water source conservation, preventing soil erosion and other natural disasters, and preserving and shaping people’s living environment.
We have also covered decommissioned tailing dams with soil to promote reforestation and have continued applying fertilizers and conducting regular inspections to ensure proper maintenance and long-term sustainability.

  1. ※3As a measure to control sulfur dioxide gas emissions from smelters, in 1956 we established the Furukawa–Outokumpu flash smelting technology (patented), successfully achieving both sulfur dioxide gas capture and cost reduction. This technology was subsequently recognized both domestically and internationally and adopted by numerous smelters, thus helping reduce environmental impact.

Cherry Tree-Planting Activities

Ashio Cherry Tree-Planting Drive

The Furukawa Company Group formed the Ashio Cherry Tree-Planting Drive, which aims to plant 1,000 cherry tree saplings on Company-owned land in Ashio-machi (Nikko City, Tochigi Prefecture) as part of its own greening activities. Since the first event in March 2009, we have held tree-planting drives every year. In April 2024, we held our 12th tree-planting event, which was attended by 73 people, including Group employees and their families. This year, we planted 60 Somei-Yoshino cherry trees, bringing the total number of trees planted to date to 660.
Also in April 2024, we held the seventh Furukawa-no-mori Tree-Planting Drive (organized by the Tochigi Furukawa Association*4) on Company-owned land in the Matsuki area of Ashio-machi. A total of 78 members from 19 Tochigi Furukawa Association member companies participated, planting 40 Somei-Yoshino cherry trees. We will continue hosting both events in the future.

  1. ※4Organization of companies in the Furukawa Company Group in Tochigi Prefecture